![]() LoP 1.6 A/D Director - Key Responsibilities Requirement 1.6.1 The A/D Director shall: i. Confirm appropriate measures (e.g., barricades) have been implemented to prevent personnel from entering the Counterweight Crush Zone. Lowther-Rolton is the premier independent engineering consultancy for Heavy Lift & Construction Engineering, providing original in-house design and third-party verification services. during the pre-lift briefing (i.e., the Lift Plan) by signing the applicable lift plan checklists. Whether using overhead, mobile or crawler cranes, Lowther-Rolton has the knowledge and experience to undertake any and all of your engineering tasks, including by our in house Professional Engineers. The ASME B30.2 specification includes a list of limitations and requirements which must be fulfilled for a planned engineered lift including load limits, crane manufacturer input, review of service history, structural, mechanical, electrical, hydraulic and pneumatic reviews, checks on the supporting structure, inspection, and operational procedures. In its simplest form, Lift Plan Worksheets are a summary of your lift plan. By definition, these are relatively unusual operations undertaken as part of a new construction or major repairs. ITI Equipment and Fleet Management courses and content focus not only on the setup, traveling, and general management of cranes, but also non-crane equipment. This means making a lift where the lift is in excess of the rated load of the overhead crane. Lowther-Rolton regularly assists our clients when they need to make an engineered lift plan.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |